A public realm project including a 27 km track in 30 nodes, and a roundabout.

Location
Buqayq
Scale
27 km track, 30 nodes, roundabout
Tech Stack
Urban Design, Infrastructure Planning
Year
2025

Results Achieved

27 km
Track length
30
Nodes
2025
Delivered
01

The Challenge

Coordinating a 27 km track across 30 activity nodes.

02

The Solution

Design and development of public realm infrastructure, including a 27 km track in 30 nodes and a roundabout.

03

The Outcome

Complete public realm design delivered for 27 km track and roundabout.

The Team

The disciplines that carried the delivery.

01
Urban Design Lead

Concept development and the node-by-node public realm strategy.

02
Infrastructure Engineer

Track alignment, drainage and utility coordination across 27 km.

03
Landscape Coordinator

Planting, street furniture and irrigation integration.

Lessons Learned

What this engagement taught us.

01

Break long linear schemes into nodes: 30 defined nodes made a 27 km scope reviewable and buildable.

02

Align infrastructure corridors before landscape intent, or the design is forced into a fixed section.

03

A roundabout sets the geometric rhythm of the whole corridor; freezing it early avoids downstream redesign.