Buqayq Public Realm
A public realm project including a 27 km track in 30 nodes, and a roundabout.
Results Achieved
The Challenge
Coordinating a 27 km track across 30 activity nodes.
The Solution
Design and development of public realm infrastructure, including a 27 km track in 30 nodes and a roundabout.
The Outcome
Complete public realm design delivered for 27 km track and roundabout.
The Team
The disciplines that carried the delivery.
Concept development and the node-by-node public realm strategy.
Track alignment, drainage and utility coordination across 27 km.
Planting, street furniture and irrigation integration.
Lessons Learned
What this engagement taught us.
Break long linear schemes into nodes: 30 defined nodes made a 27 km scope reviewable and buildable.
Align infrastructure corridors before landscape intent, or the design is forced into a fixed section.
A roundabout sets the geometric rhythm of the whole corridor; freezing it early avoids downstream redesign.