Back to Portfolio
Engineering

Kingdom Centre Mall Riyadh

Engineering services for the electromechanical package on a full renovation. Every existing distribution board was surveyed and its capacity verified before a single new circuit was drawn; we then audited the full MEP scope, issued the shop drawings and coordinated a fully IP low-current package.

Location
Riyadh
Scale
56,000 m² retail area renovated
Tech Stack
MEP Engineering, Low-Current Systems, IP Coordination
Year
2025-26

Results Achieved

56,000 m²
Retail area renovated
2025-26
Delivery
Full MEP
Package
01

The Challenge

Surveying and verifying existing distribution boards in a live retail environment.

02

The Solution

Every existing distribution board was surveyed and capacity verified. Full MEP scope audited, shop drawings issued, and a fully IP low-current package coordinated.

03

The Outcome

Full renovation completed with verified MEP scope and coordinated IP low-current package.

The Team

The disciplines that carried the delivery.

01
Project Director

Programme leadership, client reporting and interface management across the live mall.

02
Lead MEP Engineer

Existing services survey, capacity verification and full MEP design coordination.

03
Low-Current & IP Specialist

Low-current and IP system design, coordinated with the power package.

04
Site Coordination Engineer

Shop drawings, RFIs and construction sequencing inside an operating retail environment.

Lessons Learned

What this engagement taught us.

01

Verify existing capacity before design: surveying every distribution board prevented late redesign in a live mall.

02

Retail continuity is a design input, not a constraint solved later: night works and phased shutdowns shaped the MEP routes from day one.

03

Power and low-current packages must be coordinated as one system, otherwise ceiling and riser space is lost twice.

Planning something similar?

Tell us about your scope and we will come back with a delivery plan.